Kiln log #32, before: the shelf map
Monday, 5 a.m., glazing day. The load is tomorrow at 7:40, so here is the plan before the horno gets a vote.
What goes in: 24 pieces. Ten cups, eight bowls, four jars, T-08, and a broken shelf post I am trying as a stilt. Three shelves this time, not two.
Shelf map:
- Top: the four jars at the back by the element, because they can take the heat. Four bowls in a ring in front of them. T-08 back left, where T-07 sat, on its cookie of scrap bisque.
- Middle, new: six cups around the witness cone pack, dead centre.
- Bottom: four cups along the back, four bowls I am willing to see come out matte at the door. Nothing I care about touches the door side.
T-08 is the same blue ash at a two-second dip, gravity 1.40. Cone packs front, middle and back.
If the front and back still disagree by half a cone, I stop blaming the door and start blaming the element on that side. A new one is 1,900 pesos. I would rather blame the door.
Feldespato has been briefed. He is asleep under the wedging table, unconvinced.
Kiln log #32, the after, on Friday.
Loading comments…